Current Projects

Work

Precision Plus is looking for some new and interesting work. If you have a job contact us on this page or go to our contact page and give us your information. We will be waiting to here from you. Thank You Tony from PP...

Munsey 2 Bath

Well we finished another job the bathrooms came out great. The plumbers came and trimmed the bathrooms and we installed the last vanity in the master bathroom. The only thing left is the town coming to give final inspection. I know there will be no problems. See you on the next job...

Munsey 2 Bath

          This is the Master Bath.
The tile is finished and the
shower door is finished. All that is
left is the vanity and sink .
 
                Upstairs Bath.
The tile and trim is finished in this
bathroom also. The vanity is in and
the Granite top is in.
 
 We got the Granite tops done at
GrandMarb.
   We are just waiting for our
plumber AWS, to come and
finish  the 2 toilets and
hook up the 2 sinks. Then this job
will be ready for inspection.
When the plumber finishes I will have the finished bathrooms on the photo page.

Munsey 2 Bath

 

We are almost finished with our tiling, I know i said that I would put up pictures at the end of last week but I figured I would put them up when we are finished with the tile work. There is some trim that needs to be done ,the medicine cabinets are in and the lights are finished. We will put the switches and the GFCI's in tomorrow. I will definitely have pictures for tomorrow. Have a great night.

Munsey 2 Bath

Today we have been busy putting up the tile in the 2 bathrooms. One of the bathrooms is finished and the other the shower is getting done. I will have pictures tomorrow when you can see them completed. Well back to work.

Munsey 2 Bath

  Well today we are still doing some spackling in both of the bathrooms.Yesterday the tile went up in the upstairs bath. The floor will be tiled after lunch today.
 Our tile just came in for the master bathroom.
 Everything is moving very well considering we have other trades on the job, which normally slow a job down.
 
 Well I hope you are finding our work to be neat and the jobs move right along. This means that we do not disrupt your life very long. Keep your questions coming and also drop us a line on our contact  page if there is a job in mind at your home. Enjoy your day or night. Tony @ Precision Plus.

Munsey 2 Bath

 
This is how we level our bathroom floors. The product is called level quick. All
we do is first we seal all around the floor, then we put down wire mesh, then
the primer to adhere the mixture to the floor and last mix up the product
which is like a thick soup, pour it on and it finds it's own level. Done...

Munsey Bath

     
        Well third time is a charm.

            Well here is a little
           taste of sheet rock 
                 and  taping.
 
 

Munsey 2 Bath

Well all back to work. Today we finished the sheetrock in both bathrooms. I also spackled both rooms. So it was a very good day. I will have some pictures on tomorrow. It was  a long day. I'll more to say later.

Happy Thanksgiving

                                 
Happy Thanksgiving to all of you from us at Precision Plus...