Current Projects

Munsey 2 Bath

 
    This is our new bath tub and
the shower and tub control   .
 
            Here is our shower base that is in the master bath.
The first picture is the sink
supply and the toilet line.
Everything is all cleaned up.
Today we also got our plumbing inspection and our electrical inspection both passed with flying colors. So next week you will see the insulation and the sheetrock going up. So I hope everyone checking in has a great Thanksgiving.

Munsey 2 Bath

    This is some of the electrical work
that was done in the bathrooms.
It might not be anything to look at
but thats our light switches
fan and night light for the 
bathroom. The next box is for 
your hair dryer and your
electric tooth brush. 
Here is on of the fans with the
exhaust hose hooked up and
wired into the electrical box.
   
     

Munsey 2 Bath

Good evening everyone, it was another late day today. The guys from AWS plumbing did all the plumbing in on day. I will have pics for you tomorrow. This is short and sweet tonight , we have an early morning inspection in the morning. So keep the comments coming I will answer any that come in. Thanks Later.

Munsey 2 Bath

       Another great day at Precision Plus. Today we had the guys from Hellman Electric at the job. They had ran some new dedicated lines for the outlets in the bathrooms. The guys also wired up the lights and also hooked up the exhaust fans. Tomorrow the guys from AWS will be coming by to do the plumbing in the 2 bathrooms. So we are really moving alone  on tis job.
      The tile came in for our kitchen, so we will tile the back splash tomorrow. Then we will grout on wednesday. So we will be finished for Thanksgiving. I am so looking forward to a 4 day weekend. So ttyl.

Munsey 2 Bath

Just so shots of fixing
the water damage
sub floor. 
   
  See I told you that I
work. 
   
We also leveled the walls and the ceiling.
Monday we have Hellman electric coming in to do our
rough in for fans and lights.
Keep you comments coming.
 We love to know what you
think.

Munsey 2 Bath

This entry is for thursday and friday or last week. Our job is 2 bathrooms we had the rip on thursday with Z-Best rubbish removal. We have been working with Z-Best for about 20 years. So this is how the day went.
       
         
    So our 
Bathrooms
are ripped out.
   
You can check out the before pictures on the photo page.

Kichen

I have the finished rail and the kitchen job for you. The kitchen backsplash will be done before Thanksgiving so she can have Thanksgiving dinner with her family in a finished kitchen. That is if everything goes as planed.
   
.  I will give you an update on the 2 bathrooms later.  

Kitchen and Bathrooms

I am so tired i'm not putting any pics in until tomorrow. We had a great day today the new bathrooms are all ripped out i have good pics of that. The kitchen will be finished next week the backsplash is all that is left. Have a good night everyone.  I'm out..........

Kitchen

Today we got our granite tops installed by GranMarb. Giovanni is the owner and also makes sure every installation is done perfect. I told him I would give him the blog page today, so I did one better for him. So go over to our photo page and see the whole installation of our Granite tops. I hope everyone can see that it's not as easy at it looks. But I have to tell you our kitchen is looking great.     We also got the outside rail finished today. We are getting the back splash tile on Monday or Tuesday. So then we will be able to do the back splash. Tomorrow we are also starting a new job we will be ripping out two bathrooms. See you later.

Kitchen

Today we finished the powder room. The small window in the powder room and started working on the out side rail. We are getting real close tomorrow we are getting our counter tops and hopefully we will get finished with the spackling. So check in tomorrow to see the new counter tops. See you later.
     
     