|
This is our new bath tub and the shower and tub control . |
![]() |
|
![]() |
Here is our shower base that is in the master bath. The first picture is the sink supply and the toilet line. Everything is all cleaned up. |
|
|
This is some of the electrical work that was done in the bathrooms. It might not be anything to look at but thats our light switches fan and night light for the bathroom. The next box is for your hair dryer and your electric tooth brush. |
| Here is on of the fans with the exhaust hose hooked up and wired into the electrical box. |
|
|
Good evening everyone, it was another late day today. The guys from AWS plumbing did all the plumbing in on day. I will have pics for you tomorrow. This is short and sweet tonight , we have an early morning inspection in the morning. So keep the comments coming I will answer any that come in. Thanks Later.
| Just so shots of fixing the water damage sub floor. |
|
|
|
|
See I told you that I work. |
|
|
|
|
|
|
|
|
|
|
|
|
|
So our Bathrooms are ripped out. |
|
|
|
| . | I will give you an update on the 2 bathrooms later. |
We also got the outside rail finished today. We are getting the back splash tile on Monday or Tuesday. So then we will be able to do the back splash. Tomorrow we are also starting a new job we will be ripping out two bathrooms. See you later.



